ACT-093 / CHK / R00
Duct Insulation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release clean tested ducts | — | — | — | — | — |
| Fit insulation around supports | — | — | — | — | — |
| Seal vapour jacket | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved duct insulation and vapour barrier
Inspection points
- Release clean tested ducts
- Fit insulation around supports
- Seal vapour jacket
Records and release
- Thickness, jacket continuity and access
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________