Building Maintenance Unit (BMU) Installation — Risk Assessment

Building Maintenance Unit (BMU) InstallationArchitectural

ACT-091 / RA / R00

Building Maintenance Unit (BMU) Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Release structure and access—————
Witness specialist installation—————
Obtain authority acceptance—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: BMU, supports and safety assemblies

Task risk review

  • Release structure and access
  • Witness specialist installation
  • Obtain authority acceptance

Assessment prompts

  • Assess interfaces relevant to this location: Falling objects, lifting and access at height.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.