ACT-091 / ITP / R00
Building Maintenance Unit (BMU) Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release structure and access | — | — | — | — | — |
| Witness specialist installation | — | — | — | — | — |
| Obtain authority acceptance | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: BMU, supports and safety assemblies
Inspection sequence
- Release structure and access
- Witness specialist installation
- Obtain authority acceptance
Inspection controls
- Track or anchors, machine IDs, load test and rescue plan
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________