External Wall Insulation — Inspection and Test Plan

External Wall InsulationArchitectural

ACT-089 / ITP / R00

External Wall Insulation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release background—————
Maintain continuity at openings—————
Check fire barriers—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: insulation, anchors, mesh and base coat

Inspection sequence

  • Release background
  • Maintain continuity at openings
  • Check fire barriers

Inspection controls

  • Thickness, fixings, gaps and concealment photos
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.