ACT-089 / ITP / R00
External Wall Insulation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release background | — | — | — | — | — |
| Maintain continuity at openings | — | — | — | — | — |
| Check fire barriers | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: insulation, anchors, mesh and base coat
Inspection sequence
- Release background
- Maintain continuity at openings
- Check fire barriers
Inspection controls
- Thickness, fixings, gaps and concealment photos
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________