External Wall Insulation — Inspection Checklist

External Wall InsulationArchitectural

ACT-089 / CHK / R00

External Wall Insulation — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release background—————
Maintain continuity at openings—————
Check fire barriers—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: insulation, anchors, mesh and base coat

Inspection points

  • Release background
  • Maintain continuity at openings
  • Check fire barriers

Records and release

  • Thickness, fixings, gaps and concealment photos
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________