ACT-089 / CHK / R00
External Wall Insulation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release background | — | — | — | — | — |
| Maintain continuity at openings | — | — | — | — | — |
| Check fire barriers | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: insulation, anchors, mesh and base coat
Inspection points
- Release background
- Maintain continuity at openings
- Check fire barriers
Records and release
- Thickness, fixings, gaps and concealment photos
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________