ACT-088 / RA / R00
GRC / GRP Panels Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Inspect delivered panels | — | — | — | — | — |
| Release fixing layout | — | — | — | — | — |
| Lift and align by approved plan | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: GRC or GRP panels, supports and hardware
Task risk review
- Inspect delivered panels
- Release fixing layout
- Lift and align by approved plan
Assessment prompts
- Assess interfaces relevant to this location: Falling objects, lifting and access at height.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________