Skip to content

ChecklistACT-088-CHKR00Available

GRC / GRP Panels Installation — Inspection Checklist

GRC / GRP Panels InstallationArchitectural

ACT-088 / CHK / R00

GRC / GRP Panels Installation — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Inspect delivered panels—————
Release fixing layout—————
Lift and align by approved plan—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: GRC or GRP panels, supports and hardware

Inspection points

  • Inspect delivered panels
  • Release fixing layout
  • Lift and align by approved plan

Records and release

  • Panel condition, connection and seam evidence
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3