ACT-088 / CHK / R00
GRC / GRP Panels Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Inspect delivered panels | — | — | — | — | — |
| Release fixing layout | — | — | — | — | — |
| Lift and align by approved plan | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: GRC or GRP panels, supports and hardware
Inspection points
- Inspect delivered panels
- Release fixing layout
- Lift and align by approved plan
Records and release
- Panel condition, connection and seam evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________