ACT-085 / CHK / R00
Glazing Works — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Check glass specification, orientation and edges | — | — | — | — | — |
| Place on supports | — | — | — | — | — |
| Complete retention | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: labelled glass, blocks, gaskets and lifting tools
Inspection points
- Check glass specification, orientation and edges
- Place on supports
- Complete retention
Records and release
- Unit locations, markings, edge condition and installation checks
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________