ACT-084 / ITP / R00
Aluminium Windows and Doors — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Survey openings | — | — | — | — | — |
| Set frames | — | — | — | — | — |
| Coordinate drainage and install hardware | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: aluminium frames, glass, hardware and seals
Inspection sequence
- Survey openings
- Set frames
- Coordinate drainage and install hardware
Inspection controls
- Anchorage, plumb, weeps and weather seals
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________