ACT-084 / CHK / R00
Aluminium Windows and Doors — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Survey openings | — | — | — | — | — |
| Set frames | — | — | — | — | — |
| Coordinate drainage and install hardware | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: aluminium frames, glass, hardware and seals
Inspection points
- Survey openings
- Set frames
- Coordinate drainage and install hardware
Records and release
- Anchorage, plumb, weeps and weather seals
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________