ACT-081 / ITP / R00
Signage and Wayfinding — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Check wording and orientation | — | — | — | — | — |
| Set accessible mounting heights | — | — | — | — | — |
| Inspect after fitting | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: signs, fixings and location schedule
Inspection sequence
- Check wording and orientation
- Set accessible mounting heights
- Inspect after fitting
Inspection controls
- Location, legibility, symbols and fixing
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________