ACT-081 / CHK / R00
Signage and Wayfinding — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Check wording and orientation | — | — | — | — | — |
| Set accessible mounting heights | — | — | — | — | — |
| Inspect after fitting | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: signs, fixings and location schedule
Inspection points
- Check wording and orientation
- Set accessible mounting heights
- Inspect after fitting
Records and release
- Location, legibility, symbols and fixing
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________