Skip to content

Risk AssessmentACT-079-RAR00Available

Handrails and Balustrades — Risk Assessment

Handrails and BalustradesArchitectural

ACT-079 / RA / R00

Handrails and Balustrades — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Release substrate edges—————
Fit approved anchors—————
Verify joints and returns—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: rails, posts, anchors and infill

Task risk review

  • Release substrate edges
  • Fit approved anchors
  • Verify joints and returns

Assessment prompts

  • Assess interfaces relevant to this location: Tool use, dust, handling and exposure to finishes.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3