ACT-079 / CHK / R00
Handrails and Balustrades — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release substrate edges | — | — | — | — | — |
| Fit approved anchors | — | — | — | — | — |
| Verify joints and returns | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: rails, posts, anchors and infill
Inspection points
- Release substrate edges
- Fit approved anchors
- Verify joints and returns
Records and release
- Height, gaps, alignment and specified load tests
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________