Skip to content

Risk AssessmentACT-078-RAR00Available

Sanitary Ware Installation — Risk Assessment

Sanitary Ware InstallationArchitectural

ACT-078 / RA / R00

Sanitary Ware Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Verify rough-in—————
Secure fixtures—————
Connect and check discharge—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: fixtures, brackets, traps and seals

Task risk review

  • Verify rough-in
  • Secure fixtures
  • Connect and check discharge

Assessment prompts

  • Assess interfaces relevant to this location: Tool use, dust, handling and exposure to finishes.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3