Sanitary Ware Installation — Inspection and Test Plan

Sanitary Ware InstallationArchitectural

ACT-078 / ITP / R00

Sanitary Ware Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Verify rough-in—————
Secure fixtures—————
Connect and check discharge—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: fixtures, brackets, traps and seals

Inspection sequence

  • Verify rough-in
  • Secure fixtures
  • Connect and check discharge

Inspection controls

  • Mounting height, stability, leakage and flow
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.