Skip to content

Inspection and Test PlanACT-077-ITPR00Available

Kitchen Cabinets Installation — Inspection and Test Plan

Kitchen Cabinets InstallationArchitectural

ACT-077 / ITP / R00

Kitchen Cabinets Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Confirm appliances and rough-in—————
Secure to supports—————
Seal wet interfaces—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: cabinet modules, worktops, fixings and sealant

Inspection sequence

  • Confirm appliances and rough-in
  • Secure to supports
  • Seal wet interfaces

Inspection controls

  • Alignment, worktop bearing, cutouts and operation
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3