ACT-077 / CHK / R00
Kitchen Cabinets Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm appliances and rough-in | — | — | — | — | — |
| Secure to supports | — | — | — | — | — |
| Seal wet interfaces | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: cabinet modules, worktops, fixings and sealant
Inspection points
- Confirm appliances and rough-in
- Secure to supports
- Seal wet interfaces
Records and release
- Alignment, worktop bearing, cutouts and operation
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________