ACT-073 / RA / R00
Timber Doors Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Confirm openings and handing | — | — | — | — | — |
| Set frame plumb | — | — | — | — | — |
| Fit and adjust hardware | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: timber door sets, frames and hardware
Task risk review
- Confirm openings and handing
- Set frame plumb
- Fit and adjust hardware
Assessment prompts
- Assess interfaces relevant to this location: Tool use, dust, handling and exposure to finishes.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________