ACT-073 / ITP / R00
Timber Doors Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm openings and handing | — | — | — | — | — |
| Set frame plumb | — | — | — | — | — |
| Fit and adjust hardware | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: timber door sets, frames and hardware
Inspection sequence
- Confirm openings and handing
- Set frame plumb
- Fit and adjust hardware
Inspection controls
- Clearances, leaf operation and finish
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________