ACT-072 / ITP / R00
Carpet and Vinyl Flooring — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release substrate moisture | — | — | — | — | — |
| Confirm batch and pattern | — | — | — | — | — |
| Finish seams and thresholds | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: carpet or vinyl, adhesive and seam equipment
Inspection sequence
- Release substrate moisture
- Confirm batch and pattern
- Finish seams and thresholds
Inspection controls
- Pattern continuity, seam quality, adhesion and edge finish
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________