ACT-072 / CHK / R00
Carpet and Vinyl Flooring — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release substrate moisture | — | — | — | — | — |
| Confirm batch and pattern | — | — | — | — | — |
| Finish seams and thresholds | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: carpet or vinyl, adhesive and seam equipment
Inspection points
- Release substrate moisture
- Confirm batch and pattern
- Finish seams and thresholds
Records and release
- Pattern continuity, seam quality, adhesion and edge finish
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________