ACT-071 / ITP / R00
Raised Access Flooring — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release subfloor and datum | — | — | — | — | — |
| Coordinate services | — | — | — | — | — |
| Fix grid and panels | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pedestals, stringers and removable panels
Inspection sequence
- Release subfloor and datum
- Coordinate services
- Fix grid and panels
Inspection controls
- Levels, rocking, cutout support and access
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________