ACT-071 / CHK / R00
Raised Access Flooring — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release subfloor and datum | — | — | — | — | — |
| Coordinate services | — | — | — | — | — |
| Fix grid and panels | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pedestals, stringers and removable panels
Inspection points
- Release subfloor and datum
- Coordinate services
- Fix grid and panels
Records and release
- Levels, rocking, cutout support and access
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________