ACT-069 / CHK / R00
External Painting — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release substrate and weather | — | — | — | — | — |
| Protect glazing | — | — | — | — | — |
| Apply approved coats by elevation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: exterior coating, primer and access equipment
Inspection points
- Release substrate and weather
- Protect glazing
- Apply approved coats by elevation
Records and release
- Weather, coverage and finish consistency
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________