ACT-055 / ITP / R00
Fire-Proofing Paint (Intumescent) for Steel — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release compatible substrate | — | — | — | — | — |
| Apply specified coats | — | — | — | — | — |
| Protect and verify cure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: primer, intumescent paint and film gauges
Inspection sequence
- Release compatible substrate
- Apply specified coats
- Protect and verify cure
Inspection controls
- Batch, ambient condition, film thickness and fire rating reference
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________