ACT-055 / CHK / R00
Fire-Proofing Paint (Intumescent) for Steel — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release compatible substrate | — | — | — | — | — |
| Apply specified coats | — | — | — | — | — |
| Protect and verify cure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: primer, intumescent paint and film gauges
Inspection points
- Release compatible substrate
- Apply specified coats
- Protect and verify cure
Records and release
- Batch, ambient condition, film thickness and fire rating reference
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________