ACT-051 / ITP / R00
Structural Steel Erection — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Survey anchorages | — | — | — | — | — |
| Erect under approved stability sequence | — | — | — | — | — |
| Inspect permanent connections | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: marked steelwork, braces and alignment equipment
Inspection sequence
- Survey anchorages
- Erect under approved stability sequence
- Inspect permanent connections
Inspection controls
- Piece marks, baseplate levels, plumb and stability release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________