Structural Steel Erection — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Survey anchorages | — | — | — | — | — |
| Erect under approved stability sequence | — | — | — | — | — |
| Inspect permanent connections | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: marked steelwork, braces and alignment equipment
Inspection points
- Survey anchorages
- Erect under approved stability sequence
- Inspect permanent connections
Records and release
- Piece marks, baseplate levels, plumb and stability release
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________