Skip to content

Risk AssessmentACT-039-RAR00Available

Concrete Curing — Risk Assessment

Concrete CuringStructural

ACT-039 / RA / R00

Concrete Curing — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Inspect surface—————
Apply specified curing method—————
Maintain continuity and protection—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved covers, curing water or curing compound

Task risk review

  • Inspect surface
  • Apply specified curing method
  • Maintain continuity and protection

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3