ACT-039 / ITP / R00
Concrete Curing — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Inspect surface | — | — | — | — | — |
| Apply specified curing method | — | — | — | — | — |
| Maintain continuity and protection | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved covers, curing water or curing compound
Inspection sequence
- Inspect surface
- Apply specified curing method
- Maintain continuity and protection
Inspection controls
- Timing, coverage, interruptions and curing release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________