Concrete Curing — Inspection and Test Plan

Concrete CuringStructural

ACT-039 / ITP / R00

Concrete Curing — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Inspect surface—————
Apply specified curing method—————
Maintain continuity and protection—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved covers, curing water or curing compound

Inspection sequence

  • Inspect surface
  • Apply specified curing method
  • Maintain continuity and protection

Inspection controls

  • Timing, coverage, interruptions and curing release
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.