ACT-033 / ITP / R00
Reinforcement Steel Fixing — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify bar marks | — | — | — | — | — |
| Set cages and splices | — | — | — | — | — |
| Coordinate openings before closure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: rebar, tying wire, spacers and chairs
Inspection sequence
- Verify bar marks
- Set cages and splices
- Coordinate openings before closure
Inspection controls
- Bar heat, grade, spacing, laps and cover
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________