ACT-032 / ITP / R00
Table Form / Flying Form System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm strike and travel release | — | — | — | — | — |
| Transfer using specialist plan | — | — | — | — | — |
| Reset and inspect | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: form tables, shores and lifting accessories
Inspection sequence
- Confirm strike and travel release
- Transfer using specialist plan
- Reset and inspect
Inspection controls
- Table ID, lifting points and receiving-bay survey
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________