ACT-032 / CHK / R00
Table Form / Flying Form System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm strike and travel release | — | — | — | — | — |
| Transfer using specialist plan | — | — | — | — | — |
| Reset and inspect | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: form tables, shores and lifting accessories
Inspection points
- Confirm strike and travel release
- Transfer using specialist plan
- Reset and inspect
Records and release
- Table ID, lifting points and receiving-bay survey
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________