Backfilling and Compaction — Inspection and Test Plan

Backfilling and CompactionCivil

ACT-027 / ITP / R00

Backfilling and Compaction — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release retaining interfaces—————
Place approved lifts—————
Test lots before next lift—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved fill, moisture control and compaction plant

Inspection sequence

  • Release retaining interfaces
  • Place approved lifts
  • Test lots before next lift

Inspection controls

  • Fill source, lift thickness, moisture, density and rework
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________