Temporary Power and Water Supply — Risk Assessment

Temporary Power and Water SupplyProject Management

ACT-005 / RA / R00

Temporary Power and Water Supply — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Identify supply boundaries—————
Route protected segregated services—————
Obtain authorised connection and tests—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: distribution panels, hoses and backflow fittings

Task risk review

  • Identify supply boundaries
  • Route protected segregated services
  • Obtain authorised connection and tests

Assessment prompts

  • Assess interfaces relevant to this location: Moving plant, temporary services and public access.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________