ACT-005 / CHK / R00
Temporary Power and Water Supply — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Identify supply boundaries | — | — | — | — | — |
| Route protected segregated services | — | — | — | — | — |
| Obtain authorised connection and tests | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: distribution panels, hoses and backflow fittings
Inspection points
- Identify supply boundaries
- Route protected segregated services
- Obtain authorised connection and tests
Records and release
- Circuit IDs, isolation and backflow evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________