ACT-004 / ITP / R00
Temporary Site Offices and Facilities — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release pads | — | — | — | — | — |
| Position and level cabins | — | — | — | — | — |
| Coordinate accessible entry and utilities | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: portable cabins, supports and access steps
Inspection sequence
- Release pads
- Position and level cabins
- Coordinate accessible entry and utilities
Inspection controls
- Cabin IDs, bearing, exits and utility checks
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________