ACT-004 / CHK / R00
Temporary Site Offices and Facilities — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release pads | — | — | — | — | — |
| Position and level cabins | — | — | — | — | — |
| Coordinate accessible entry and utilities | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: portable cabins, supports and access steps
Inspection points
- Release pads
- Position and level cabins
- Coordinate accessible entry and utilities
Records and release
- Cabin IDs, bearing, exits and utility checks
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________