ACT-003 / ITP / R00
Site Hoarding and Gates Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Set out routes and gate clearances | — | — | — | — | — |
| Release footings | — | — | — | — | — |
| Hang and secure leaves | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: hoarding panels, posts and gate hardware
Inspection sequence
- Set out routes and gate clearances
- Release footings
- Hang and secure leaves
Inspection controls
- Alignment, anchorage, gate swing and pedestrian segregation
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________