ACT-003 / CHK / R00
Site Hoarding and Gates Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Set out routes and gate clearances | — | — | — | — | — |
| Release footings | — | — | — | — | — |
| Hang and secure leaves | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: hoarding panels, posts and gate hardware
Inspection points
- Set out routes and gate clearances
- Release footings
- Hang and secure leaves
Records and release
- Alignment, anchorage, gate swing and pedestrian segregation
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________