Skip to content

SiteQuality Pro

Site improvement roadmap

Work through one phase at a time. Verify each exit criterion before starting the next phase.

  1. Phase 1 · Built, pending walkthrough verification

    Pilot inspection walkthrough

    Guide visitors from the EV bays and canopy to a lobby tile, the floor build-up and its Word checklist.

    Ready to move on: Confirm the checklist opens and Return preserves the selection and camera on desktop, tablet and mobile.

    Open the pilot walkthrough
  2. Phase 2 · Built, pending walkthrough verification

    3D realism and a connected building

    Improve materials, lighting, exterior detail and the transitions between parking, reception, lifts, corridors, plant rooms and roof. Add floor plans and quick jumps.

    Ready to move on: The interior and exterior read as the same building from every approach.

  3. Phase 3 · Planned

    Five more inspection walkthroughs

    Add ceiling damper, roof drain, curtain-wall anchor, bored pile and EV charger walkthroughs. Add useful layer and stage comparisons without losing the camera.

    Ready to move on: Every walkthrough goes from a selected element to its detail and the correct record.

  4. Phase 4 · Planned

    Mobile, tablet and reliability

    Improve the model viewport, touch targets, inspection panel, on-demand loading and the experience without 3D.

    Ready to move on: Visitors can complete an inspection on small screens and reach the library without WebGL.

  5. Phase 5 · Planned

    Document discovery and quality

    Improve search for trade terms, abbreviations, IDs and document types. Clarify availability and revisions, strengthen priority records, and verify Word, Excel, PDF and ZIP output.

    Ready to move on: Search and direct links lead to the right record and all advertised download formats open.

  6. Phase 6 · Planned

    Catalogue coverage and trade packs

    Give all 170 activities a clear path from model elements, project stages or the library. Bundle related inspection and handover records.

    Ready to move on: Every activity can be found, even when it has no model element.

  7. Phase 7 · Planned

    Revision publishing

    Give admins a draft, review and publish flow with retained prior versions.

    Ready to move on: A reviewed revision can replace a public record without losing its history.

  8. Phase 8 · Planned

    Private project workspace

    After the public experience is reliable, add private inspection records, site photos and closeout tracking, separate from the free library.

    Ready to move on: Teams can complete a private inspection and closeout without exposing their project data.