ACT-169 / ITP / R00
O&M Manuals and Training — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Build manuals by asset | — | — | — | — | — |
| Verify operating instructions and warranties | — | — | — | — | — |
| Conduct approved training | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: asset schedule, manufacturer literature and training logs
Inspection sequence
- Build manuals by asset
- Verify operating instructions and warranties
- Conduct approved training
Inspection controls
- Manual index, tags, attendance and remaining training
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________