Landscaping and Planting — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify species and condition | — | — | — | — | — |
| Release bed and drainage | — | — | — | — | — |
| Plant and establish irrigation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: plant stock, growing media, stakes and mulch
Inspection sequence
- Verify species and condition
- Release bed and drainage
- Plant and establish irrigation
Inspection controls
- Species, quantities and condition at establishment release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________