ACT-156 / ITP / R00
Lift Testing and Commissioning — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm readiness | — | — | — | — | — |
| Witness approved operation and emergency scenarios | — | — | — | — | — |
| Obtain authority disposition | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved specialist lift test apparatus and records
Inspection sequence
- Confirm readiness
- Witness approved operation and emergency scenarios
- Obtain authority disposition
Inspection controls
- Levelling, protection, communications, load-test and retest records
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________