ACT-147 / CHK / R00
Structured Cabling (Data and Voice) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release pathways and separation | — | — | — | — | — |
| Label both ends | — | — | — | — | — |
| Certify each link | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: cabling, outlets, patch panels and certifier
Inspection points
- Release pathways and separation
- Label both ends
- Certify each link
Records and release
- Outlet mapping, performance results and repairs
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________