ACT-146 / CHK / R00
Access Control System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate hardware and egress | — | — | — | — | — |
| Install controlled openings | — | — | — | — | — |
| Witness fail-state and override | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: readers, locks, contacts and power supplies
Inspection points
- Coordinate hardware and egress
- Install controlled openings
- Witness fail-state and override
Records and release
- Door IDs, fire override, credential policy and free egress
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________