ACT-145 / RA / R00
CCTV System — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Approve viewpoints and masks | — | — | — | — | — |
| Mount and configure | — | — | — | — | — |
| Verify recording and replay | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: camera, brackets, links and recorder
Task risk review
- Approve viewpoints and masks
- Mount and configure
- Verify recording and replay
Assessment prompts
- Assess interfaces relevant to this location: Shared service routes, powered equipment and elevated access.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________