ACT-144 / ITP / R00
Electrical Testing and Commissioning — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify readiness and responsibilities | — | — | — | — | — |
| Witness authorised scenarios | — | — | — | — | — |
| Refer energisation to approved authority | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: electrical test instruments, schedules and isolations
Inspection sequence
- Verify readiness and responsibilities
- Witness authorised scenarios
- Refer energisation to approved authority
Inspection controls
- Circuit and protection tests, interlocks and defects
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________