ACT-136 / RA / R00
Diesel Generator Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Release base and ventilation | — | — | — | — | — |
| Coordinate exhaust and fuel | — | — | — | — | — |
| Witness authorised load test | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: generator, mounts, exhaust and fuel connections
Task risk review
- Release base and ventilation
- Coordinate exhaust and fuel
- Witness authorised load test
Assessment prompts
- Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________